Monday, September 7, 2015

400th Post - Stage 5 - Head Assembly - 6hrs































Head Assemble -
Torque M10 oversized head studs, clean deck, lube bores with ATF.
Clean head, install head gasket, install head studs, install head, lube threads with ARP lube.
Oversized valves +1mm, upgraded springs, titanium retainers.





/z27a-4g15-engine-re-assembly-torque.html


New timing belt, cam seals, stem seals, gaskets, timing gear, water pumps.

/stage-4-big-ends-pistons-and-rods-6hrs.html
/stage-3-measuring-ring-gapping-6hrs.html




/stage-2-block-cleaning-crank-install.html
/stage-1-block-cleaning-4hrs.html

Clean lifters:
/4g15-4g63-mitsubishi-lash-adjuster.html
/diesel-cleaning-bleeding-tappetslash.html










Cam seal installation.












Install valve train.











Install oil pickup and windage tray.
Next time I might look into a mesh based windage screen tray and baffle. The mesh forms a one way flow of oil.


















Ending up installing the head before the sump, not sure why. Stupid me. All together, tempted to pain the block.

2 comments:

  1. Very nice Brad. :)

    Are those bigger valves?

    Juri

    ReplyDelete