Monday, March 31, 2014

7 Days to turn the Key - Project Build - 4G15


/progress-yet-again-forged-4g15-turbo.html

< we cleaned up the plenum as best we could, removed the 90degree edge, and tried to contour it as best as possible
/4g15-mivec-forge-build-nearing.html

Two souls set out on a long road and its finally come to the end. All we need is some gasket goop for the exahust manifold and install the turbo and put oil and fluid in the engine.
















Lower injector insulator / lower cushions / Seal ring >>

















We need new Fuel Injector Sheets / fuel pipe insulator / grommet >

















- redid all the FMIC pipe work (not shown)
- install fuel reg, fuel rail spacers, lower injector insulator
- clean all flanges
- install fuel rail with new seals and o-rings
- new tb gasket & new intake plenum gasket
- old OEM turbo is going in for the short term